Construction of Public, Service, and Rental Office Buildings
The project for construction of public works, services, and rental offices is located at land plot E.3/CCKO1, Bo De Ward, Long Bien District (now part of Hanoi City), with the objective of developing a high-rise complex fully synchronized with technical and social infrastructure. The project implements the N10 urban subzone plan at a scale of 1/2000, approved by the City People’s Committee, aiming to meet both immediate and long-term urban development needs, in line with the practical conditions of local residents. The estimated investment capital is over 571 billion VND, with an operational period of 50 years.
General Information
Project Name: Construction of Public, Service, and Rental Office Buildings Sector/Field: Commerce Construction Location: Plot E.3/CCKO1, Bo De Ward, Long Bien District (currently Bo De Ward, Hanoi City after local administrative restructuring) Project Objectives:
Develop a high-rise complex with public, service, and rental office functions, synchronized with technical and social infrastructure, meeting both short-term and long-term urban development standards, and suitable for the practical conditions of residents in Long Bien District.
Implement the N10 urban subzone plan at 1/2000 scale approved by Hanoi People’s Committee under Decision No. 6115/QD-UBND dated 21/11/2014. Outstanding Advantages:
Modern construction technology ensures a high-quality, synchronized infrastructure complex.
Serves as a landmark in urban architecture and landscape, enhances land value, promotes local socio-economic development.
Improves living environment and creates jobs both directly and indirectly through service activities. Project Scale: Land Area: 9,928.6 m² Construction Area: 3,972 m²
Construction Density: 40% Floors: 9 above ground + 2 basement floors
Total Floor Area – Above Ground: 35,568 m²
Total Floor Area – Underground: 9,294.6 m² Functional Allocation: Commercial & Service: 31,616 m² (shopping center and rental office) Public Use: 3,952 m² (library, cinema) Project Investment: 571,724,869,000 VND (Five hundred seventy-one billion, seven hundred twenty-four million, eight hundred sixty-nine thousand VND) Operating Duration: 50 years from the date of land allocation, lease, or decision granting land use rights under legal regulations
Location
Key Advantages
01
1. Modern Complex – A New Symbol of Green Urban Development
The project is constructed using modern technology to create a high-rise complex with contemporary design, fully synchronized with technical infrastructure.
02
2. Unlocking Potential – Shaping a Modern, Civilized Urban Area
It serves as a landmark within the urban architectural and natural landscape, enhancing the land’s value, contributing to a modern, civilized cityscape, and promoting local socio-economic development
The project is planned on a land area of approximately 9,928.6 m², with a construction footprint of around 3,972 m² and a construction density of 40%. The building comprises 9 above-ground floors and 2 basement levels, with a total above-ground floor area of 35,568 m² and an underground floor area of 9,294.6 m². Functional allocation includes a shopping center and rental office space (around 31,616 m²), along with public amenities such as a library and cinema totaling approximately 3,952 m². The design is modern, fully integrated, and applies advanced construction technologies.
Legal Documents
Relevant Legal Decisions for the Project:
Public
1. Decision No. 3998/QD-UBND dated 09/08/2023 by Hanoi People’s Committee approving the investment policy.
Resolution 45/2026/NQ-HĐND: Regulations on deciding and approving investment policies and adjusting investment policies; selecting investors and contractors in special cases; determining projects that need to be implemented immediately in Hanoi (Implementing points a, b, and d of Clause 5, Article 22 of the Capital City Law No. 02/2026/QH16)
Decision No. 2512/QD-UBND dated May 13, 2026, of the Hanoi People's Committee approving the overall planning of Hanoi Capital City with a 100-year vision.
The Capital City Law 2026 (amended) was passed by the National Assembly on April 23, 2026, and officially came into effect on July 1, 2026, replacing the old law of 2024. The new law focuses on expanding the institutional space and granting Hanoi special autonomy for development.
UBND thành phố Hà Nội ban hành Quyết định số 575/QĐ-UBND ngày 05/02/2026 của UBND Thành phố về việc ban hành danh mục dự án thu hút đầu tư thành phố Hà Nội năm 2026 và các năm tiếp theo.
Quyết định số 1567/QĐ-TTPVHCC ngày 11/11/2025 của Trung tâm Phục vụ hành chính công về việc công bố Danh mục thủ tục hành chính được sửa đổi, bổ sung, thay thế,bãi bỏ trong lĩnh vực đầu tư tại Việt Nam; đầu tư theo phương thức đối tác công tư; đấu thầu lựa chọn nhà đầu tư; thủ tục hành chính mới ban hành trong lĩnh vực thành lập và hoạt động của tổ hợp tác, hợp tác xã và liên hiệp hợp tác xã (thực hiện theo Nghị quyết 66/NQ-CP ngày 26/3/2025 của Chính phủ) thuộc phạm vi chức năng quản lý của UBND thành phố Hà Nội.
The 2024 Capital City Law contains many groundbreaking provisions to create opportunities for Hanoi's development commensurate with its potential. Among these, attracting strategic investors is a policy for Hanoi to implement its strategy of welcoming large investors, creating breakthroughs in sectors that the city has identified as key drivers of economic growth in the coming years.
On July 9th, the Hanoi Department of Finance issued a document requesting departments, agencies, and localities to review and finalize the list of investment attraction projects for Hanoi city in the 2025-2030 period.
Quyết định số 897/QĐ-TTPVHCC ngày 24/6/2025 của Trung tâm phục vụ hành chính công về việc công bố Danh mục thủ tục hành chính (TTHC) Lĩnh vực Tài chính (bao gồm các TTHC thực hiện theo Nghị quyết 66/NQ-CP ngày 26/3/2025 và TTHC phân luồng “Làn xanh”) thuộc phạm vi chức năng quản lý của UBND thành phố Hà Nội.
On 29 June 2026, the Conference on the announcement of the Hanoi Capital Master Plan with a 100-year vision and 2026 Investment Promotion was held at the National Convention Center, in accordance with Plan No.210/KH-UBND dated 31 May 2026, issued by the Hanoi People’s Committee.
On April 24, at the national conference on accelerating allocation and disbursement of public investment capital in 2026, Party Central Committee Member, Vice Secretary of the Hanoi Party Committee and Chairman of the Hanoi People's Committee Vu Dai Thang delivered remarks at the Hanoi People's Committee site.
On March 30, at the Hanoi Party Committee headquarters, General Secretary To Lam, head of the Politburo's Inspection and Supervision Delegation No. 10, chaired a conference to present the draft report on the first phase of supervision and launch the second phase of inspection for the Standing Board of the Hanoi Party Committee.